Kam’ianska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
140,05 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 210226-B36823A4
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date02. 2026
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

"Major repairs of the building of the KNP KMR "CPMSD No. 3" at the address: Kamianske, Serhiy Slisarenko St., 3E." Correction

Project Goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Increasing compliance with modern standards
Geography
Kam’ianska community
Initiator
KAMIAN CITY COUNCIL
Maturity level
77
"Major repairs of the building of the KNP KMR "CPMSD No. 3" at the address: Kamianske, Serhiy Slisarenko St., 3E." Correction
Current repairs of the outpatient clinic of the KNP KMR "CPMSD No. 3" at the address: Kamianske, Serhiy Slisarenko St., 3E
Outpatient clinic of general practice of family medicine No. 6 provides primary and secondary medical care services to the population of the city of Kamianske and internally displaced persons registered in the city of Kamianske. Since 1974, no major repairs have been carried out in the building of the outpatient clinic of family medicine No. 6. Internal networks of water supply, water drainage, and heat media are supplied from metal pipes, 80% of which are in an emergency condition. The windows and doors are wooden, which have leaky connections over the years of operation. In winter, there is a large heat loss due to old windows. Cubicles, corridors, sanitary units, stairs are in an unsatisfactory condition (plaster is peeling on both the walls and the ceiling, the floor is cracked). The purpose of our participation in the project is to improve the quality of the provision of medical services to visitors, patients, people with disabilities and internally displaced persons by increasing the comfort of staying in the dispensary building, as well as rational use of funds and energy through the implementation of energy-saving measures.
Project cost139'900'769 UAH
Implementation period29 months