Dniprovska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
234
Projects
Projects by sectors
234
Projects
Projects by goal
234
Projects
Projects by status
59'854,97 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Project cost
Status
Initiation date
Project cost
Status
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

"Creation of educational space in pilot educational institutions within the framework of the implementation of the "New Ukrainian School" reform in educational institutions of the city of Dnipro"

Project Goal
Increasing compliance with modern standards. Improving the quality of services
Geography
Dnipro city
Initiator
DEPARTMENT OF HUMANITARIAN POLICY OF THE DNIPROV CITY COUNCIL
Maturity level
80
"Creation of educational space in pilot educational institutions within the framework of the implementation of the "New Ukrainian School" reform in educational institutions of the city of Dnipro"
Advantages (Pros) • Economic efficiency: Funds are spent specifically on “stuffing” (microscopes, sensors, panels), and not on expensive general construction work or redevelopment of premises. • Speed of implementation: The space is updated within one procurement and installation cycle. This allows teachers to start working with new equipment in the current academic year. • Technological leap: Even in the old building, a modern digital laboratory appears that meets the requirements of the National School of Education and prepares students for real scientific research (STEM approach). • Preservation of human resources: Teachers are motivated to work in a familiar environment, but with new generation tools, which increases the prestige of the institution.
Creation of a modern educational space in Dnipro within the framework of the National School of Education (2025-2026). The project is focused on creating a safe, child-centered environment, improving the quality of education, and supporting specialized training.
Project cost14'285'715 UAH
Implementation period18 months
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorScientific and technical activity
StatusInvestment Feasibility Study

Purchase of solar power plants for educational, cultural, and sports institutions in the city of Dnipro with installation - energy saving measures

Project Goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards, Improving the quality of services
Geography
Dnipro city
Initiator
DEPARTMENT OF HUMANITARIAN POLICY OF THE DNIPROV CITY COUNCIL
Maturity level
75
Purchase of solar power plants for educational, cultural, and sports institutions in the city of Dnipro with installation - energy saving measures
This alternative solution involves significant financial costs.
The project involves the purchase and installation of solar power plants for educational institutions in the city of Dnipro. The goal is to increase energy independence and reliability of energy supply. Solar power plants will ensure the operation of critical systems of educational institutions in conditions of a complete power outage from the network. (shelter, fire and security alarms, Internet, ventilation, lighting). The integration of solar power plants into the existing infrastructure will contribute to the stability of energy supply to educational institutions, reduce budget costs and reduce the negative impact on the environment.
Project cost71'433'973 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorScientific and technical activity
StatusInvestment Feasibility Study

Purchase of solar power plants for preschool educational institutions in the city of Dnipro with installation - energy saving measures

Project Goal
Introducing innovations and energy-efficient solutions. Increasing the even distribution of resources, Improving the condition of infrastructure, Improving the quality of services
Geography
Dnipro city
Initiator
DEPARTMENT OF HUMANITARIAN POLICY OF THE DNIPROV CITY COUNCIL
Maturity level
79
Purchase of solar power plants for preschool educational institutions in the city of Dnipro with installation - energy saving measures
Purchase of generators for educational institutions in the city of Dnipro with installation
The project involves the purchase and installation of solar power plants for 83 educational institutions in the city of Dnipro. The goal is to increase energy independence and reliability of energy supply. Solar power plants will ensure the operation of critical systems of educational institutions in conditions of a complete power outage from the network. (shelter, fire and security alarms, Internet, ventilation, lighting). The integration of solar power plants into the existing infrastructure will contribute to the stability of energy supply to educational institutions, reduce budget costs and reduce the negative impact on the environment.
Project cost123'840'309 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Energy saving measures

Project Goal
Introducing innovations and energy-efficient solutions. Contribution to climate or environmental goals
Geography
Dnipropetrovska region
Initiator
DEPARTMENT OF POPULATION SELF-ORGANIZATION OF THE DNIPRO CITY COUNCIL
Maturity level
75
Insulation of facades
Installation of an individual heating point
The level of energy efficiency of such buildings is low: thermal insulation systems are absent or have lost their properties, facades have numerous defects, which leads to excessive heat loss and high heating costs. Existing engineering networks are functional, but are morally outdated and do not meet modern energy saving standards. Target audience coverage - residents of apartment buildings, mainly families with medium or low incomes, who suffer most from high energy tariffs. The capacity of existing systems does not allow for effective maintenance of a comfortable temperature in apartments during the cold season. The main factors limiting the effective use of infrastructure: worn-out facades and roofs, insufficient thermal insulation, heat loss through uninsulated walls, windows and seams, as well as the lack of comprehensive energy efficiency measures.
Project cost520'950'000 UAH
Implementation period26 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Reconstruction of the water pumping station "Prydniprovsk" at Avtoparkova Street, 7-A in the city of Dnipro

Project Goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the quality of services
Geography
Dniprovska community, Dnipro city
Initiator
MUNICIPAL ENTERPRISE "DNIPROVODOKANAL" OF THE DNIPRO CITY COUNCIL
Maturity level
75
Reconstruction of the water pumping station "Prydniprovsk"
Overhaul of pumping units and shut-off valves at the water pumping station "Prydniprovsk"
The technical solution provides for: replacement of morally and physically obsolete main equipment in the VNS switchyard, pipelines and shut-off valves; reconstruction of the RP-10 kV with replacement of transformers and reconstruction of the RP-0.4 kV with installation of ACS cabinets; renovation of the building; reconstruction of heating and ventilation systems; replacement/installation of internal and external lighting; installation of lightning protection; reconstruction of the heating system.
Project cost20'000'000 UAH
Implementation period12 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorDevelopment and Reconstruction of Subnational Infrastructure
StatusPreliminary Investment Feasibility Study

Reconstruction of the boiler room with the installation of a cogeneration gas piston unit at the address: 24 A Robocha St. in the city of Dnipro.

Project Goal
Improving the quality of services. Increasing the even distribution of resources
Geography
Dnipro city
Initiator
MUNICIPAL ENTERPRISE "TEPLOENERGO" OF THE DNIPRO CITY COUNCIL
Maturity level
60
Reconstruction of the boiler room with the installation of a cogeneration gas piston unit at the address: 24 A Robocha St. in the city of Dnipro.
Reconstruction of the boiler room with the installation of a solar power plant (SPP) and storage tanks at the address: 24 A Robocha St. in the city of Dnipro.
The project includes measures to install a containerized gas-piston cogeneration plant (CPG) with a nominal electrical capacity of 2.3 MW.
Project cost97'180'000 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorDevelopment and Reconstruction of Subnational Infrastructure
StatusPreliminary Investment Feasibility Study

Reconstruction of the boiler room with the installation of a cogeneration gas piston unit at the address: Mykola Rudenka St., 67 in the city of Dnipro.

Project Goal
Improving the quality of services. Increasing the even distribution of resources
Geography
Dnipro city
Initiator
MUNICIPAL ENTERPRISE "TEPLOENERGO" OF THE DNIPRO CITY COUNCIL
Maturity level
68
Reconstruction of the boiler room with the installation of a cogeneration gas piston unit at the address: Mykola Rudenka St., 67 in the city of Dnipro.
Reconstruction of the boiler room with the installation of a solar power plant (SPP) and storage tanks at the address: Mykola Rudenka St., 67 in the city of Dnipro.
The project involves the installation of a containerized gas-piston cogeneration plant (CPG) with a nominal electrical capacity of 2.3 MW.
Project cost100'620'000 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorDevelopment and Reconstruction of Subnational Infrastructure
StatusInvestment Feasibility Study

Reconstruction of an administrative building for a center for providing administrative services in the "Transparent Office" format at the address: Dnipro, Mykhailo Hrushevskoho St., 70

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure
Geography
Dnipro city
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION OF DNIPROV CITY COUNCIL
Maturity level
77
Reconstruction of an administrative building for a center for providing administrative services in the "Transparent Office" format at the address: Dnipro, Mykhailo Hrushevskoho St., 70
Current (partial) renovation of the administrative building
The basic alternative solution is to reconstruct the administrative building at the address: Dnipro, Mykhayla Hrushevskoho St., 70, in order to create a modern center for providing administrative services in the format of a «Transparent Office». The project involves replanning the interior, arranging open work areas and waiting areas for citizens. During the reconstruction, engineering networks will be modernized, modern electronic queue systems, information terminals and video surveillance will be installed. Special attention is paid to creating accessibility conditions for low-mobility groups, including the arrangement of ramps and elevators. The use of energy-efficient technologies will reduce operating costs and increase the level of comfort. As a result of the project, a modern «Transparent Office» will be created, which will meet the needs of the community and contribute to the development of urban infrastructure.
Project cost389'808'988 UAH
Implementation period13 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorDevelopment and Reconstruction of Subnational Infrastructure
StatusPreliminary Investment Feasibility Study

Providing the facility of the Municipal Enterprise "Dniprovsky Metro" with alternative power sources (solar generation)

Project Goal
Introducing innovations and energy-efficient solutions. Contribution to climate or environmental goals, Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Dniprovska community, Dnipro city
Initiator
MUNICIPAL ENTERPRISE "DNIPROV METROPOLITAN" OF DNIPROV CITY COUNCIL
Maturity level
75
Providing the facility of the Dnipro Metro with alternative power sources (solar generation)
Use of diesel generators during emergency power outages
It is planned to install solar power plants with a total capacity of about 2000 kW at the Dnipro Metro facility. The placement of photovoltaic modules will be carried out taking into account the structural features of the roofs and optimal orientation for maximum electricity generation. The stations will operate in self-consumption mode, providing energy supply for electric heating, lighting and household needs of the electric depot. Integration of solar installations with the enterprise's internal power grids will allow reducing the amount of electricity consumption from the city network and increasing the reliability of energy supply.
Project cost50'880'000 UAH
Implementation period18 months
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

"Reconstruction of the premises of the educational and administrative building at the address: 7 Universalnyi Avenue, Dnipro" (development of design and estimate documentation, including correction of design and estimate documentation, reconstruction work)

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions
Geography
Dnipro city
Initiator
DEPARTMENT OF HUMANITARIAN POLICY OF THE DNIPROV CITY COUNCIL
Maturity level
77
"Reconstruction of the premises of the educational and administrative building at the address: 7 Universalnyi Avenue, Dnipro" (development of design and estimate documentation, including correction of design and estimate documentation, reconstruction work)
New construction of a building to create educational space for a gymnasium in Dnipro
Ensuring the realization of the right of citizens to receive high-quality basic general secondary education, in particular, the organization of the educational process in a full-time form of study.Creating safe conditions for participants in the educational process and the opportunity to continue the educational process after the announcement of an air raid alert while in shelter.Creating a modern educational space for Gymnasium No. 86 to provide educational services to students, which will ensure high-quality education, meet the standards of the New Ukrainian School, digital education standards and contribute to the preservation of the contingent of students.Premises reconstructionRedevelopment and major repairs of the building to create modern educational spaces.Equipment of 13 classrooms: 4 - for primary school and 9 - for secondary school. for secondary. Creation of specialized premises: 2 rooms for group classes (when dividing the class into groups), medical office, psychologist's office, library, dining room, Updating all administrative and sanitary-hygienic premises. Equipping with modern equipment. Purchasing interactive boards for classrooms. Equipping classrooms with modern materials and multimedia equipment. Ensuring inclusive access. Installing ramps for free movement of low-mobility population groups. Arranging specialized workplaces for students with special educational needs. Creating special toilet rooms adapted for people with disabilities.
Project cost45'940'000 UAH
Implementation period18 months

In focus

All news