Ratnivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
34
Projects
Projects by sectors
34
Projects
Projects by goal
34
Projects
Projects by status
411,22 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Project cost
Status
Initiation date
Project cost
Status
Local level of SPP
Local level of SP
Date05. 2026
SectorCulture and information
SubsectorCultural Services
StatusInvestment Feasibility Study

Major repairs to install a fire alarm system at the Ratnivka Public Library, a branch of the municipal institution "Center for Cultural Services" of the Ratnivka Village Council at the address: 31a Centralna Street, Ratne village, Kovel district, Volyn region

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the quality of services
Geography
Volynska region
Initiator
MUNICIPAL ESTABLISHMENT "CENTER OF CULTURAL SERVICES" OF THE RATNIV VILLAGE COUNCIL
Maturity level
88
Major repairs to install a fire alarm system at the Ratnivka Public Library, a branch of the municipal institution "Center for Cultural Services" of the Ratnivka Village Council at the address: 31a Centralna Street, Ratne village, Kovel district, Volyn region
Major repairs to install a fire alarm and fire extinguishing system at the Ratnivka Public Library, a branch of the municipal institution "Center for Cultural Services" of the Ratnivka Village Council at the address: 31a Centralna Street, Ratne village, Kovel district, Volyn region
The implementation of the project will contribute to bringing the facility into compliance with current fire safety standards, increasing the reliability of the building's operation, and improving the quality of cultural and educational services provided to the community.
Project cost550'000 UAH
Implementation period5 months
Design documentationAbsent
State level of SP
Local level of SPP
Local level of SP
Date05. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creation of an educational space in educational institutions of the Ratnivka territorial community within the framework of the “New Ukrainian School” reform

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Ratnivska community
Initiator
DEPARTMENT OF HUMANITARIAN POLICY OF THE RATNIV VILLAGE COUNCIL
Maturity level
88
Creation of an educational space in educational institutions of the Ratnivka territorial community within the framework of the “New Ukrainian School” reform
Purchase of teaching aids for educational institutions of the Ratnivska territorial community
The project involves the creation of chemistry and biology laboratories for the gymnasium at Ratniv Lyceum No. 2 named after M. Zalipa of the Ratniv Village Council, a chemistry laboratory for the gymnasium at the Supporting Educational Institution "Girnikiv Lyceum of the Ratniv Village Council", a biology laboratory for the gymnasium at the Zhyrychiv Lyceum of the Ratniv Village Council. To create a modern educational space, current repairs of classrooms will be carried out and the necessary equipment will be purchased. The project will be completed by the end of 2026.
Project cost2'620'632 UAH
Implementation period8 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Arrangement of safe conditions (fire protection): Major repairs (installation of fire alarm) of the building of building No. 3 of the Supporting Educational Institution "Girnyky Lyceum of Ratnivska Village Council" at the address: Volyn region, Kovelsky district, village of Girnyky, Peremohy st., 5

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Hirnyky village
Initiator
Supporting educational institution "Mining Lyceum of Ratnivka Village Council"
Maturity level
93
Arrangement of safe conditions (fire protection): Major repairs (installation of fire alarm) of the building of building No. 3 of the Supporting Educational Institution "Girnyky Lyceum of Ratnivska Village Council" at the address: Volyn region, Kovelsky district, village of Girnyky, Peremohy st., 5
Partial installation of a fire alarm system. Use of autonomous fire detectors (sensors) without a centralized system
Overhaul (installation of fire alarm) of building No. 3 of the Supporting Educational Institution "Girnyky Lyceum of Ratnivska Village Council" at the address: Volyn region, Kovelsky district, village of Girnyky, Peremohy st., 5. The project includes the installation of automatic fire detectors, control and monitoring devices, and fire alarm systems. The goal is to increase the level of fire safety, timely detection of fires, and ensuring safe conditions for students and staff in the educational institution.
Project cost544'920 UAH
Implementation period4 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Arrangement of safe conditions (fire protection): Major repairs (installation of fire alarm) of buildings of the supporting educational institution "Kortelisi Lyceum named after Vasyl Kornelyuk of the Ratniv Village Council" at the address: Volyn region, Kovel district, Kortelisi village, Pam'yati square, 3

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Kortelisy village
Initiator
Supporting educational institution "Kortelisk Lyceum named after Vasyl Kornelyuk of the Ratnivka Village Council"
Maturity level
88
Arrangement of safe conditions (fire protection): Major repairs (installation of fire alarm) of buildings of the supporting educational institution "Kortelisi Lyceum named after Vasyl Kornelyuk of the Ratniv Village Council" at the address: Volyn region, Kovel district, Kortelisi village, Pam'yati square, 3
Major renovation of the building of the Supporting Educational Institution “Kortelisi Lyceum named after Vasyl Kornelyuk of the Ratniv Village Council” with the installation of a fire alarm system, a fire alarm and evacuation management system, lightning protection, internal fire-fighting water supply, as well as the performance of related electrical installation and finishing works at the address: Volyn region, Kovel district, Kortelisi village, Pam’yati square, 3.
Provision of safe conditions (fire protection).
Project cost2'619'680 UAH
Implementation period6 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Arrangement of safe conditions (fire protection): major repairs (installation of fire alarm) of the buildings of the Zdomyshelsky Lyceum of the Ratnivska Village Council at the address: Volyn region, Kovelsky district, Zdomyshel village, Shevchenko street, 4

Project Goal
Improving the condition of infrastructure. Increasing compliance with modern standards
Geography
Ratnivska community, Zdomyshel village
Initiator
Zdomyshelsky Lyceum of the Ratnivka Village Council
Maturity level
88
Arrangement of safe conditions (fire protection): major repairs (installation of fire alarm) of the buildings of the Zdomyshelsky Lyceum of the Ratnivska Village Council at the address: Volyn region, Kovelsky district, Zdomyshel village, Shevchenko street, 4
Provision of safe conditions (fire protection): partial installation of a fire alarm system. Use of autonomous fire detectors (sensors) without a centralized system
Installation of addressable fire alarm systems with sensors in all classrooms, corridors, utility and technical rooms. Creation of an evacuation warning and control system (sound and light alarms, emergency lighting, evacuation signs). Laying of new cable networks, installation of backup power and panel, certified devices for early detection of smoke and temperature increase. Testing and certification of the installed system, training of personnel in operating rules.
Project cost1'576'080 UAH
Implementation period9 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Arrangement of safe conditions (fire protection): major repairs (installation of fire alarm and lightning protection) of the buildings of the Brody Lyceum of the Ratnivka Village Council at the address: Volyn region, Kovel district, Brody village, Ozerna st., 4

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Brody village
Initiator
Brody Lyceum of Ratnivka Village Council
Maturity level
88
Major repairs (installation of fire alarm and lightning protection) of the buildings of the Brody Lyceum of the Ratnivka Village Council at the address: Volyn region, Kovel district, Brody village, Ozerna st., 4
Partial installation of a fire alarm system. Use of autonomous fire detectors (sensors) without a centralized system
An educational institution is an environment where a large number of children, teachers and other employees stay and requires reliable protection from possible emergencies.
Project cost1'379'740 UAH
Implementation period9 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Purchase of a "School Bus" for the Supporting Educational Institution "Ratniv Lyceum No. 1 named after Hero of Ukraine Eduard Kamardin of the Ratniv Village Council"

Project Goal
Improving the quality of services. Meeting demand
Geography
Ratnivska community, Ratne town
Initiator
DEPARTMENT OF HUMANITARIAN POLICY OF THE RATNIV VILLAGE COUNCIL
Maturity level
88
Purchase of a "School Bus" for the Supporting Educational Institution "Ratniv Lyceum No. 1 named after Hero of Ukraine Eduard Kamardin of the Ratniv Village Council"
Attracting rented vehicles for transporting students of the Supporting Educational Institution "Ratniv Lyceum No. 1 named after Hero of Ukraine Eduard Kamardin of the Ratniv Village Council"
The purchase of a school bus will ensure regular and free transportation of students to and from their place of study
Project cost4'000'000 UAH
Implementation period4 months
Design documentationAbsent
State level of SP
Local level of SPP
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creation of a modern educational space in the Supporting Educational Institution "Ratniv Lyceum No. 1 named after Hero of Ukraine Eduard Kamardin of the Ratniv Village Council"

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Ratnivska community
Initiator
DEPARTMENT OF HUMANITARIAN POLICY OF THE RATNIV VILLAGE COUNCIL
Maturity level
82
Creation of a modern educational space in the Supporting Educational Institution "Ratniv Lyceum No. 1 named after Hero of Ukraine Eduard Kamardin of the Ratniv Village Council"
Purchase of educational equipment for the classrooms of the Supporting Educational Institution "Ratniv Lyceum No. 1 named after Hero of Ukraine Eduard Kamardin of the Ratniv Village Council"
The project envisages the creation of a modern educational space in the Supporting Educational Institution "Ratniv Lyceum No. 1 named after Hero of Ukraine Eduard Kamardin of the Ratniv Village Council" by purchasing educational equipment for science classrooms and a STEM laboratory. It is separately planned to carry out the repair of part of the corridor and classrooms in accordance with modern requirements. The implementation of the project will make it possible to provide qualitatively new conditions for studying science subjects and expand the list of study profiles, since from 2027 the educational institution will become the only academic lyceum in the territorial community.
Project cost7'087'000 UAH
Implementation period4 months
Design documentationAbsent
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creation of a modern educational space in the Supporting Educational Institution "Ratniv Lyceum No. 1 named after Hero of Ukraine Eduard Kamardin of the Ratniv Village Council"

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Ratnivska community
Initiator
DEPARTMENT OF HUMANITARIAN POLICY OF THE RATNIV VILLAGE COUNCIL
Creation of a modern educational space in the Supporting Educational Institution "Ratniv Lyceum No. 1 named after Hero of Ukraine Eduard Kamardin of the Ratniv Village Council"
Purchase of educational equipment for the classrooms of the Supporting Educational Institution "Ratniv Lyceum No. 1 named after Hero of Ukraine Eduard Kamardin of the Ratniv Village Council"
The project envisages the creation of a modern educational space in the Supporting Educational Institution "Ratniv Lyceum No. 1 named after Hero of Ukraine Eduard Kamardin of the Ratniv Village Council" by purchasing educational equipment for science classrooms and a STEM laboratory. It is separately planned to carry out the repair of part of the corridor and classrooms in accordance with modern requirements. The implementation of the project will make it possible to provide qualitatively new conditions for studying science subjects and expand the list of study profiles, since from 2027 the educational institution will become the only academic lyceum in the territorial community.
Project cost8'142'250 UAH
Implementation period4 months
Design documentationAbsent
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Arrangement of safe conditions (fire protection): Major repairs (installation of fire alarm) of buildings of the supporting educational institution "Kortelisi Lyceum named after Vasyl Kornelyuk of the Ratniv Village Council" at the address: Volyn region, Kovel district, Kortelisi village, Pam'yati square, 3

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Ratnivska community, Kortelisy village
Initiator
Supporting educational institution "Kortelisk Lyceum named after Vasyl Kornelyuk of the Ratnivka Village Council"
Arrangement of safe conditions (fire protection): Major repairs (installation of fire alarm) of buildings of the supporting educational institution "Kortelisi Lyceum named after Vasyl Kornelyuk of the Ratniv Village Council" at the address: Volyn region, Kovel district, Kortelisi village, Pam'yati square, 3
Major renovation of the building of the Supporting Educational Institution “Kortelisi Lyceum named after Vasyl Kornelyuk of the Ratniv Village Council” with the installation of a fire alarm system, a fire alarm and evacuation management system, lightning protection, internal fire-fighting water supply, as well as the performance of related electrical installation and finishing works at the address: Volyn region, Kovel district, Kortelisi village, Pam’yati square, 3.
Provision of safe conditions (fire protection).
Project cost2'619'680 UAH
Implementation period6 months
Design documentationAbsent

In focus

All news