Volodymyr-Volynska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
28
Projects
Projects by sectors
28
Projects
Projects by goal
28
Projects
Projects by status
923,89 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Project cost
Status
Stream

Current set filters (Filtered result: 28)

Project code: 130426-F3AA9AF1
Initiation date
Project cost
Status
Local level of SPP
Local level of SP
Date04. 2026
SectorHealthcare
SubsectorRehabilitation
StatusInvestment Feasibility Study

Reconstruction of external water supply and drainage networks of building No. 1 of the infectious diseases department of the municipal enterprise "Volodymyr Territorial Medical Association" of the Volodymyr City Council at 10 Shukhevych General Street in the city of Volodymyr, Volyn region

Project Goal
Improving the quality of services. Increasing compliance with modern standards, Improving the equality of wealth distribution, Introducing innovations and energy-efficient solutions
Geography
Volodymyr city
Initiator
MUNICIPAL ENTERPRISE "VOLODYMYRS TERRITORIAL MEDICAL ASSOCIATION" OF VOLODMYRS CITY COUNCIL
Maturity level
83
Reconstruction of external water supply and drainage networks
Leaving the existing state unchanged
Major repairs of existing external water supply and sewage networks of building No. 1 of the infectious disease department of the municipal enterprise "Volodymyr Territorial Medical Association" of the Volodymyr City Council at 10 Shukhevych General Street in the city of Volodymyr, Volyn region
The project involves the new construction of external engineering networks of water supply and sewage to ensure the functioning of the rehabilitation center, which will be located in building No. 1 of the infectious disease department of the municipal enterprise "Volodymyr territorial medical association" of the Volodymyr city council at the address: 10 General Shukhevych Street, Volodymyr, Volyn region. The project involves the laying of new networks using modern materials and technologies that will ensure their durability, energy efficiency and environmental safety.
Project cost3'770'266 UAH
Implementation period9 months
Design documentationAbsent