Khmilnytska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
2,39 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 230326-D7E04399
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Reconstruction of the 0.4 kV electrical network in terms of implementing a ground-based network solar power plant for the own needs of sewage treatment plants in the power supply system of the Khmilnykvodokanal Commune at the address: Vinnytsia region, Khmilnyk city, Vugrynovska street 130

Project Goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards
Geography
Vinnytska region
Initiator
MUNICIPAL ENTERPRISE "KHMILNYKVODOKANAL" OF THE KHMILNYT CITY COUNCIL
Reconstruction of the 0.4 kV electrical network in terms of implementing a ground-based network solar power plant for the own needs of sewage treatment plants in the power supply system of the Khmilnykvodokanal Commune at the address: Vinnytsia region, Khmilnyk city, Vugrynovska street 130
Modernization of the existing power grid + solar power plant (with the production of a power plan and its examination)
The alternative solution involves a complete modernization of the existing 0.4 kV power grid of the treatment facilities of the Khmilnykvodokanal municipal enterprise, including the installation of a backup ground-based solar power plant. Additional backup lines and energy storage systems are being installed, ensuring uninterrupted operation during any external power outages. The solution includes: Complete replacement of cables, transformers and measuring equipment; Two solar power plants (main and backup) to ensure energy independence and partial electricity supply at critical moments; New generation automation systems, including energy consumption monitoring, LED lighting and climate control of technical rooms; Integration of systems with existing infrastructure and training of personnel for maintenance.
Project cost1'850'100 UAH
Implementation period18 months