Bershadska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
23,47 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 230226-D4D8A320
Initiation date
Budget
Status
State level of SP
Local level of SPP
Local level of SP
Date02. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Reconstruction of the catering unit and dining room with replacement of technological equipment of the Bershad Lyceum at 54 Yuriy Kovalenko St., Bershad, Haisyn district, Vinnytsia region

Project goal
Increasing compliance with modern standards. Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions, Improving the quality of services
Geography
Bershad city
Initiator
DEPARTMENT OF EDUCATION AND SPORTS OF BERSHAD CITY COUNCIL
Reconstruction of the catering unit and dining room with replacement of technological equipment of the Bershad Lyceum at 54 Yuriy Kovalenko St., Bershad, Haisyn district, Vinnytsia region
Partial reconstruction of the catering unit with replacement of technological equipment of the Bershad Lyceum
The reconstruction project at 54 Yuriy Kovalenka St. is the creation of a modern educational space based on the "basic kitchen" model and HACCP standards. Key project areas: Technological re-equipment: Replacing old stoves with energy-efficient combi-steamers and cooking boilers. This provides 636 students with healthy food (steaming, stewing) and saves up to 40% of electricity. Safety and zoning: Division of premises into separate departments (meat, vegetable, flour) to prevent cross-contamination. Installation of sterilizers for knives and washing machines with disinfection at $85^{\circ}\text{C}$. Inclusivity: Installation of vertical lifts at the entrances to the MGN, a freight lift for raw materials from the basement and marking of zones in Braille. Engineering modernization: New ventilation system, water filtration and softening, installation of grease traps to protect the sewer system. Canteen renovation: Complete renovation of the hall for 215 seats using antibacterial HPL panels, ergonomic furniture and contactless hygiene zones. Result: Transformation of an outdated block into a safe, high-tech production and a comfortable place for students to relax.
Budget23'470'439 UAH
Implementation period7 months

In focus

All news