Zbarazka

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
3
Projects
Projects by sectors
3
Projects
Projects by goal
3
Projects
Projects by status
90,16 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Project cost
Status
Initiation date
Project cost
Status
State level of SP
Local level of SPP
Local level of SP
Date05. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creation of an educational space within the framework of the “New Ukrainian School” reform - Zbarazh urban territorial community

Project Goal
Improving the quality of services. Increasing compliance with modern standards
Geography
Zbarazka community, Zbarazh city
Initiator
Department of Education, Youth and Sports of the Zbarazh City Council
Maturity level
73
Creation of theoretical training rooms and laboratory rooms with major repairs in secondary education institutions of Zbarazh city council, Ternopil region
Creation of two theoretical training rooms and two laboratory rooms with ongoing repairs in secondary education institutions of Zbarazh city council, Ternopil region
Carrying out major repairs will make it possible to equip the classrooms with modern laboratory equipment, furniture and teaching aids, ensuring long-term operational reliability of the premises. The creation of modern laboratories will allow for practical and research classes in accordance with the requirements of the National School of Ukraine. The solution will increase the prestige of the institution and create a modern, safe, inclusive environment for all participants in the educational process. The project provides for a comprehensive renovation of classrooms at Zbarazhsky Lyceum No. 1 of the Zbarazhsky City Council of the Ternopil region to meet the requirements of the New Ukrainian School pilot project. The modernization includes the purchase of modern equipment, furniture, teaching materials and ICT tools in order to create a safe, inclusive and technological educational environment. The implementation of the project will contribute to improving the quality of the educational process, the introduction of a competency-based approach and the development of students in accordance with the standards of the National School of Ukraine.
Project cost14'322'400 UAH
Implementation period9 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date01. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

New construction of treatment facilities in the sugar factory area of Zbarazh, Ternopil district, Ternopil region

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Zbarazh city
Initiator
Regional Development Department of Zbarazh City Council
Maturity level
81
New construction of wastewater treatment plants
Installation of modular treatment plants
The complex of new treatment facilities in the area of the Zbarazh sugar factory will include a sewage supply station (including a switching unit and a well with valves), a pressure collector for supplying sewage to the treatment facilities and treatment facilities, which include: a sand screen, a concrete tank, a distribution well, a biological treatment plant for domestic wastewater "Dzherelo D500", a block box for ultraviolet disinfection, a block box for compressors and operators, a sewage drainage station for sludge sites, a sludge reception station from sewage treatment plants, a sludge site, a generator, a KTP, a clean water tank, a gravity collector for draining purified water.
Project cost64'337'956 UAH
Implementation period13 months
Design documentationAvailable
Local level of SPP
Local level of SP
Date11. 2025
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Reconstruction and Implementation of Energy Efficiency Measures for the Administrative Building of the Zbarazh Town Council at 1 Franka Square, Zbarazh

Project Goal
Introducing innovations and energy-efficient solutions. Improving the condition of infrastructure
Geography
Zbarazh city
Initiator
ZBARAZ CITY COUNCIL
Maturity level
86
Reconstruction of the roof of an administrative building with the installation of solar panels to increase energy efficiency
Major roof repairs without installing a solar panel system
The alternative technical solution involves modernizing the roof of the administrative building of the Zbarazh City Council with the simultaneous installation of solar panels. This will ensure increased energy efficiency of the facility, reduced electricity consumption from the network, reduced building maintenance costs and reduced greenhouse gas emissions. The solution is aimed at creating a modern, safe and energy-efficient building with a long service life.
Project cost11'500'000 UAH
Implementation period18 months
Design documentationAbsent

In focus

All news