The project involves the capital construction of a pedestrian path using modern vibro-pressed figured paving elements (paving slabs) on a prepared concrete and sand-crushed base. The main components of the solution: Covering arrangement: use of high-quality tiles 60 mm thick, resistant to mechanical loads and temperature fluctuations. Lighting system: installation of an autonomous or network-connected line of LED street lighting on metal supports. Barrier-free: full compliance with DBN V.2.2-40:2018 (lowering curbs to 0 cm, installation of two types of tactile tiles - directional and warning). Drainage: arrangement of trays for rainwater drainage and formation of regulatory slopes of the path. Landscaping: installation of park benches, anti-vandal urns and comprehensive landscaping (lawns and ornamental trees).
Project cost6'000'000 UAH
Implementation period9 months