Current set filters (Filtered result: 1)

Project code: 150426-C195F821
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major repairs of internal power supply networks with the installation of a solar station for the building of the preschool educational institution "Karamelka" of the Fontansky village council of the Odessa district of the Odessa region at the address: Kryzhanivka village, 4 Sofiivska st.

Project Goal
Introducing innovations and energy-efficient solutions. Improving the equality of wealth distribution
Geography
Kryzhanivka village
Initiator
Department of Education of the Fontana Village Council of the Odesa District of the Odesa Region
Major repairs of internal power supply networks with the installation of a solar station for the building of the preschool educational institution "Karamelka" of the Fontansky village council of the Odessa district of the Odessa region at the address: Kryzhanivka village, 4 Sofiivska st.
Installation of a powerful diesel or gas generator
The project involves a major overhaul of the internal power supply system of the building of the preschool educational institution "Karamelka" in the village of Kryzhanivka, Odessa region, with the simultaneous installation of a solar power plant. The work includes the installation of 84 solar panels with a total capacity of 47.46 kW, the installation of a hybrid inverter with a capacity of 50 kW and batteries with a capacity of 72 kW·h to provide autonomous and backup power. The project does not involve interference with the supporting structures of the building and meets the requirements of strength, reliability and durability. The total estimated cost of implementation is approximately UAH 3.65 million. The expert report confirmed that the design documentation complies with current building codes and received a positive assessment.
Project cost3'951'624 UAH
Implementation period4 months