Stepivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
0,50 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 151225-777EDE23
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major repairs. Installation of a lightning protection system for the building of the Novokaterinivsky Lyceum of the Stepivskyi Village Council, Mykolaiv district, Mykolaiv region

Project goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the condition of infrastructure, Improving the quality of services
Geography
Novokaterynivka village
Initiator
DEPARTMENT OF EDUCATION, CULTURE, YOUTH AND SPORTS OF THE STEPIV VILLAGE COUNCIL
Major repairs. Installation of a lightning protection system for the building of the Novokaterinivsky Lyceum of the Stepivskyi Village Council, Mykolaiv district, Mykolaiv region
Arrangement of a simplified lightning protection system using individual rod lightning rods without a full grid and a complete grounding circuit
The technical solution involves the implementation of a complex of works on major repairs by installing an external lightning protection system for the building of the Novokaterinivsky Lyceum of the Stepivskyi Village Council of the Mykolaiv district of the Mykolaiv region in accordance with the requirements of DSTU EN 62305, which includes the installation of a lightning rod grid on the roof, the installation of rod lightning rods to protect chimneys and dormer windows, the laying of current conductors on the facades of the building and the installation of a grounding circuit from vertical grounding conductors and horizontal connecting elements with a standard resistance of no more than 10 Ohms, in order to ensure the protection of the building, engineering networks, students and employees of the educational institution from direct lightning strikes and its secondary manifestations and bringing the facility into compliance with current safety standards.
Budget509'967 UAH
Implementation period3 months