General information

Description of the project

Creating a modern educational space at the Siletsk Lyceum of Kamianskaya TG is the creation of interactive spaces equipped with digital measuring complexes, multimedia systems, safe workplaces, ergonomic furniture and materials for practical research, which increases interest in natural sciences. The project plans to equip 3 modern natural science laboratories - chemistry, biology and physics and one STEM laboratory, which will be equipped with the necessary laboratory equipment, demonstration materials and digital teaching aids for conducting experimental research and practical classes. The laboratory space will be adapted for the implementation of project activities, experimentation, modeling and work with modern educational technologies. In addition to laboratories, it is planned to modernize theoretical learning spaces, which will be equipped with modern furniture, multimedia equipment and teaching materials for effective teaching and implementation of interactive teaching methods. The problem that the project solves:  non-compliance of classrooms with modern educational standards, insufficient level of equipment, which limits the possibilities of implementing a competency-based approach and using modern educational technologies. Expected results: creation and renovation of a modern educational space; improving the quality of educational services; providing students and teachers with access to modern equipment; improving learning conditions and implementing the state standard of basic secondary education.  

The purpose of the project

Main Goal:

Increasing compliance with modern standards

Secondary Goal:

Increasing compliance with modern standards, Improving the quality of services

Description of the purpose of the project and ways to achieve it

The main goal of the project is to create a new, modern educational space, which will become the basis for providing high-quality educational services and provide an appropriate material and technical base for the academic lyceum. The project plans to equip three modern natural science laboratories - chemistry, biology and physics, which will be equipped with the necessary laboratory equipment, demonstration materials and digital teaching aids for conducting experimental research and practical classes. It is also planned to create a STEM laboratory, which will provide integrated learning in natural sciences, technology, engineering and mathematics. The laboratory space will be adapted for the implementation of project activities, experimentation, modeling and work with modern educational technologies.

Problems and solutions resulting from project implementation

Problems: non-compliance of the material and technical base with the requirements of the National University of Science and Technology; limited opportunities for laboratory and practical work; insufficient level of digitalization of the educational process; worn-out furniture and equipment. If not resolved: decrease in the quality of the educational process; restriction of students' access to modern educational technologies; deepening of the gap between the requirements of state standards and actual learning conditions. Expected results of implementation: creation of three modern science classrooms; improvement of the quality of educational services; ensuring access of students and teachers to modern laboratory and digital equipment; formation of a safe and modern educational environment.

Socio-economic context

Indicator

Value

Other social

3 units

Other social

750 human

Other social

1 units

Strategic Case

Strategic feasibility of the project

Sector

Education and science

Subsector

School education

Stream

Providing secondary education institutions with teaching aids and equipment within the framework of the implementation of the "New Ukrainian School" reform

Strategic document

State Strategy for Regional Development for 2021–2027

Task

2.1 Providing quality education and preschool services in the community

Project objectives

Indicator
Base value
Target value
Number of STEM laboratories created
0 units
1 units
Number of users of educational services
506 human
750 human
Number of modernized science classrooms
0 units
3 units

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Метод тенденцій (екстраполяція) та опитування.
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
506 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

None of the options are applicable

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

None of the options are applicable

Does the project provide for improving women's access to services?

The project will improve women's access to education (primary, secondary, vocational)
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Economic analysis of the Lyceum OP project.pdf
23.04.2026
01:04:12 UTC

Alternative technical solutions

Technical Solution 1

Modern educational space in the Siletsk Lyceum of the Kamianka Rural Territorial Community of the Transcarpathian Region

Technical Solution 2

Partial renewal of outdated teaching aids and maintenance of the existing condition of educational premises without changing the configuration of the educational space

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)9'199'183 UAH400'000 UAH
For implementation9'199'183 UAH400'000 UAH
Project operation and closure cost260'000 UAH20'000 UAH
For operation250'000 UAH20'000 UAH
For closing10'000 UAH0 UAH
Average annual costs50'000 UAH0 UAH
Project duration, incl.7 months4 months
Deadline for developing a FFS1 month1 month
Implementation period6 months3 months
Service life60 months24 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
1
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget9'459'183 UAH420'000 UAH
Project cost (preparation and implementation)9'199'183 UAH400'000 UAH
For preparation0 UAH0 UAH
For implementation9'199'183 UAH400'000 UAH
Project operation and closure cost260'000 UAH20'000 UAH
For operation250'000 UAH20'000 UAH
For closing10'000 UAH0 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service UnitСередня вартість виконання проєкту на одного учасника освітнього процесу
Service Unit Cost12'612 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
The project does not fall under the PPP format by its nature/character

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
Strategic justification - analysis of the strategic feasibility of the project

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - economic analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - communication with stakeholders

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - risk management

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - social and gender analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - public consultations

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of available procurement options

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - legal support

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - SDG compliance analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - working with international financial organizations (IFOs)

[Response was provided in the Preliminary Investment Feasibility Study]

Financial analysis - financial analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - demand analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - environmental expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of the market environment

[Response was provided in the Preliminary Investment Feasibility Study]

Does the team have experience implementing similar projects?
Yes, successfully implemented 1 or more similar projects

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
Economic feasibility study - technical expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Is there an understanding of where to find relevant experts and consultants?
Yes, negotiations are already underway.

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Technical riskDefinedUndefined
Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
23/04/2026SP-L-230426-C41A46D5Community SPInvestment Feasibility StudyInclude--
25/04/2026SP-N-250426-F48A4A6EState SPInvestment Feasibility StudyInclude--
23/04/2026SPP-L-230426-36D4AF24Community SPPInvestment Feasibility StudyInclude--