Basic data
Problems
Current status, description of problems and needs for their solution
The project is at the final stage of its implementation. Within the framework of the Project, 42 contracts were concluded, of which 17 contracts were implemented. At the moment, due to force majeure, preparations are underway for the early completion of 5 contracts within the scope of the actually performed works. The expected completion date of other contracts is June 2025.
increasing the level of reliability of high-voltage substation equipment,
reducing the probability of emergency situations in the operation of the electricity transmission system,
reducing the risks of interruptions in the supply of electricity for the population and industry,
improvement of the conditions for increasing the efficiency of the operation of the United Energy System of Ukraine by increasing the reliability of the electricity transmission system,
improvement of the situation with compensation of reactive power in networks, which will create technical conditions for closer integration of the UES of Ukraine into the European Network of Electric Power Transmission System Operators (ENTSO-E),
creation of prerequisites for the effective functioning of the electricity market in Ukraine.
A detailed description of the project goal and the way to achieve it
The goal of the project is to increase the reliability of the electricity transmission system, create prerequisites for the introduction of a full-scale electricity market and its effective functioning, which will allow Ukraine to become an important and full-fledged player on the European electricity markets.
Coordination of the project with strategic documents
Sphere development strategies
The project complies with the provisions of the Energy Strategy of Ukraine for the period until 2050, approved by the order of the CMU of April 21, 2023 No. 373.
Demand for the service and its dynamics
Category
Year
Rating
Measure
Project indicators
Indicator
Base value
Target value
Other
0
1
Risk assessment
Risk
Category
Degree
Probability
Strategy
force majeure circumstances related to the armed aggression of the Russian Federation against Ukraine
Other risk
Critical
High
Reduction
Project plan
Implementation
Financing
Preparation
Budgeting
Appraisal
Assessment
Technical design
Feasibility study
3997 days
3286 days
3286 days
3286 days
364 days
364 days
364 days
364 days