Construction of protective structures against damage by unmanned aerial vehicles and missiles at energy infrastructure facilities


The purpose of the project:

Other

Key spending unit
State Agency for Reconstruction and Development of Infrastructure of Ukraine
Functional classification of expenditures and budget crediting
0260 - Інша діяльність у сфері оборони
Target priority of the government
010801 - Забезепчення захисту інфраструктури в підсекторі "Електроенергетика"
Score
5.2036

Basic data

Detailed description of the project

The project "Construction of protective structures against damage by unmanned aerial vehicles and missiles at energy infrastructure facilities" is aimed at protecting critically important facilities of the energy system of Ukraine.

In the conditions of the ongoing war, the energy infrastructure is one of the key elements of national security, as its functioning directly affects the livelihood of the population and the stability of the country's economy.

As part of the project, it is planned to build protective structures at 22 electrical substations in different regions of the country, which will provide a comprehensive approach to protecting these objects from attacks by unmanned aerial vehicles and rocket hits.

These structures will have the ability to withstand both direct and indirect impacts, which will significantly reduce the risk of large-scale accidents and power outages. The project involves the construction of protective structures at 22 electrical substations in 14 regions of Ukraine. This will help reduce the risk of damage to infrastructure, ensure the stability of energy supply and increase national security.

The main goal of the project is to protect energy facilities from damage, which will minimize economic losses and increase the stability of the energy system in war conditions.

Expected results include increasing the security of the energy infrastructure, reducing the risks of power outages, and reducing the cost of restoring damaged facilities. The project will contribute to ensuring the stable functioning of Ukraine's energy system and strengthening its national security.

See more

Problems

Current status, description of problems and needs for their solution
The main problem is the increased vulnerability of electrical substations to damage by an aggressor, which can cause serious damage to the infrastructure. The lack of adequate protection threatens mass power outages and significant economic losses for its restoration. In case of damage, restoration of substations will require significant resources and time, which will worsen the situation in the energy system. This, in turn, will affect the livelihood of the population, the operation of critical facilities for the economy and the state's defense capability. The problem becomes especially relevant in the conditions of a long military conflict, when the risk of attacks remains high. Without proper resolution of these issues, the country risks losing the stability of its energy supply, which will have serious consequences for national security.
A detailed description of the project goal and the way to achieve it
The goal of the project is to ensure reliable protection of electrical substations from attacks by an aggressor, which will allow maintaining the stability of the energy supply. To achieve this goal, protective structures will be built at 22 electrical substations in 14 regions of Ukraine. Currently, electrical substations do not have adequate protection, making them vulnerable to attack, and this poses significant risks to the power system of the entire country. Implementation of the project will make it possible to eliminate this gap, ensuring the necessary level of security and stability of critical infrastructure. Thus, the project will make it possible to reach the target state in which the energy system will be able to function stably even in crisis conditions.

Coordination of the project with strategic documents

Activity program of the Cabinet of Ministers of Ukraine
The procedure for the implementation of the experimental project on the construction, repair and other engineering and technical measures for the protection of critical infrastructure objects of the fuel and energy sector of critical infrastructure
Priority action plan of the government
Clause 347 of the Plan of Priority Actions of the Government for 2024 approved by the Order of the Cabinet of Ministers of Ukraine of February 16, 2024 No. 137-r

Involved organizations

Organization
STATE AGENCY OF RESTORATION AND DEVELOPMENT OF INFRASTRUCTURE OF UKRAINE
Roles
  • Project author
  • An executor
  • An initiator
EDRPOU code
37641918
Organization
MINISTRY OF DEVELOPMENT OF COMMUNITIES AND TERRITORIES OF UKRAINE
Roles
  • An initiator
EDRPOU code
37472062

Demand for the service and its dynamics

Category
Year
Rating
Measure

Project indicators

Indicator
Base value
Target value
Information is absent

Risk assessment

Risk
Category
Degree
Probability
Strategy
Lack of funding for project implementation
Financial risk
Critical
High
Acceptance

Project plan

Implementation
Budgeting
Financing
Appraisal
Assessment
Preparation
822 days
151 days
92 days
62 days
30 days
15 days

Documents

Name
Date
Information document on project implementation.docx
Common document
19.08.2024
07:56:39 UTC

Gallery

DREAM Code

DREAM-UA-190824-511C8BAD

Status

Active

Create date

19.08.2024

Estimated budget

115'882'723'500

Project creator

STATE AGENCY OF RESTORATION AND DEVELOPMENT OF INFRASTRUCTURE OF UKRAINE

Initiator

STATE AGENCY OF RESTORATION AND DEVELOPMENT OF INFRASTRUCTURE OF UKRAINE. PRIVATE JOINT STOCK COMPANY "NATIONAL ENERGY COMPANY "UKRENERGO". MINISTRY OF DEVELOPMENT OF COMMUNITIES AND TERRITORIES OF UKRAINE. MINISTRY OF ENERGY OF UKRAINE

Implementer

STATE AGENCY OF RESTORATION AND DEVELOPMENT OF INFRASTRUCTURE OF UKRAINE

Project implementation period

07.23 - 12.25

Geography

The territory of Ukraine

Classification of sectors of economic activity according to the taxonomy of the World Bank

LZ - Other Energy and Extractives